NEWTry every module free for 3 days. No card, no setup call.
The problem

The line ran against a specification that had already been superseded.

Drawings and work instructions get revised, the printed copy at the station does not, and a batch is produced to the wrong version. The non-conformance that follows is investigated from memory, because the record of what was current that week no longer exists.

What changes

Three things manufacturing teams notice first

How it works

Three steps, start to finish.

What you get

Everything a line needs, in one place

Controlled documents and production evidence on the same record.

Specifications and work instructionsControlled revisions with release statusBatch records tied to a revisionNon-conformances with a named ownerInspection checklistsCalibration and certificate expiriesCorrective actions tracked to closeSupplier documents and contactsAn audit trail nobody can edit

Suppliers and auditors can be invited to exactly what they need to see, and nothing more.

Questions

What people ask first

The released revision is what opens. Older ones remain in the history for traceability rather than in circulation.

Yes. The batch record points at the exact revision in force when it was produced, so traceability does not depend on dates lining up.

Yes. Expiries sit on the calendar and raise themselves before they lapse, assigned to the person responsible.

Get started

Put one product line on it this week.

Three days free, five seats, every module. Take the line with the most revision history and see the traceability hold.

3 days · 5 seats · every module · no card